Whether you are anchored off the coast or dockside, we can install a fast cure skid resistant or an orange peel textured decorative ARR resin floor coating on your craft.
Getting ready to apply the coating using the aft deck as a mixing station.
After applying the fast cure ARR resin, colored flake is broadcast into the fresh resin and allowed to cure. Usually, it takes less then twenty minutes to fully cure in warm environments.
Excess decorative colored flake is removed by broom, then vacuumed to remove any remaining decorative flake.
The square holes in the floor are the access panels to chases for utilities.
Hatch covers were coated separately on the bridge after the floor in that area was coated, then covered with visqueen and cardboard to protect the new floor from possible spillage from the hatch cover coating operation.
Looking down the stairs from the bridge to the starboard bunk, head and laundry.
Starboard view from the forward shower into the head and the aft bunk area.
Port side head and shower.
Starboard head and shower area looking forward.
Strarboard head, laundry and shower.
Galley
Leaving by dingy after the floor was complete.
Heading back to the dock with equipment used to pour the decorative floor. This craft was anchored in a bay off of the east coast of Florida and was based in the Bahamas.